論文

  • YAMAGUCHI et al. (2018) 『The Press-in Method Assisted with Augering: Case studies of Single U and Double Z Shaped Piles in the United Kingdom』

    Author(s): Masafumi YAMAGUCHI,Kensei YAMADA

    Key words: Press in assisted with augering , single U piles , double Z piles , augering area
    [1.12 MB]
  • ARAI et al. (2018) 『Case Study of Underwater Press-in Method of Steel Sheet Piles under Restricted Headroom beneath a Railroad Bridge』

    Author(s): Minoru ARAI,Shunji SUGIO,Katsuyuki MURAYAMA,Hiroki KUNITOMI,Yasumasa KIMURA

    Key words: canal reconstruction, press in machine, sheet pile, mechanical joint, lateral interlocking
    [1.04 MB]
  • SHIBATA et al. (2018) 『Earthquake and Tsunami Disaster Preventive Measures for Sea Embankment at Usa Fishing Port, Kochi Prefecture』

    Author(s): Daisuke SHIBATA,Shuichi NAKAMURA,Yuki ANNOURA,Masami HOSHINO,Takao SASABE,Masahiro YOSHINAGA

    Key words: coastal disaster preventive measures, sea embankment,
    steel pipe pile installation method, Press-in Method
    [1.23 MB]
  • ZENG et al. (2018) 『Piling Tests and Induced Surface Settlement of Rotating Static Pressure Steel Pipe Pile in Shanghai Soft Soil』

    Author(s): Yingjun ZENG,Chenhui LIU,Liankai ZHANG

    Key words: Rota ting static pressure, steel pipe pile, soft soil disturbance
    [0.32 MB]
  • NOZAKI (2018) 『Retaining Wall Deflection Control in Relation to Augering Area』

    Author(s): Tsunenobu NOZAKI

    Key words: Press-in Method, Retaining Wall, Chalk
    [1.13 MB]
  • NOZAKI (2018) 『The Press-in Method with Augering - Augering Area in Relation to Retaining Wall Design-』

    Author(s): Tsunenobu NOZAKI

    Key words: Press in Method, Retaining Wall , C halk
    [0.67 MB]
  • NOZAKI (2018) 『Recovery of Skin Friction of Cambridge Gault Clay with Time Effect 』

    Author(s): Tsunenobu NOZAKI

    Key words: Press in Method, Skin Friction , Clay
    [0.31 MB]
  • MATSUZAWA et al. (2018) 『Example of Construction of Sheet Pile Walls Using the Cyclic Auger Method for Anti-Seismic Reinforcement of Railway Embankment』

    Author(s):Kazuyuki MATSUZAWA,Kenichi SHIRASAKI,Seiji KONYA,Yoshiteru SUZUKI

    Key words: Cyclic Auger, GRB System, Narrow Space, Weld Joint, Railway embankment
    [1.47 MB]
  • MATSUZAWA et al. (2018) 『Example of Construction of Sheet Pile Walls for Anti-Seismic Reinforcement of Railway Embankment』

    Author(s): Kazuyuki MATSUZAWA,Kenichi SHIRASAKI,Seiji KONYA,Yoshiteru SUZUKI
     

    Key words: GRB System, Narrow Space, Weld Joint, Versatile Piler machine

    [1.63 MB]
  • IMANISHI et al. (2018) 『Case Studies: Use of the Gyropress Method in Tubular Pile Earth Retaining Walls for Foundation Works in Urban Area』

    Author(s): Tomoyuki IMANISHI,Koji KAJINO
     

    Key words: the Gyropress Method, earth retaining wall

    [0.86 MB]
 






 
 
TOP